The FAA’s readiness checklist and 15-day deadlines

Two FAA notices decide whether a Part 145 application gets into line and whether it stays alive. One sets a checklist your package has to pass before you are listed. The other lets the FAA close an application that goes quiet.

Updated . Covers Notices 8900.766 and 8900.775 as issued in 2026.

The short answer

Before your local FAA office adds you to the applicant list, it checks your package against a 14-item readiness checklist. If the package is returned and you don’t respond within 15 days, you are withdrawn.

Once certification is under way, you have 15 calendar days to answer a corrective action letter, counted from the day you receive it. Miss that and the FAA can treat your application as withdrawn. You can reapply, but you start again.

The two notices side by side

FAA Notices 8900.766 and 8900.775 compared
Notice 8900.766Notice 8900.775
SubjectDetermine Applicant Readiness for CertificationDisposition of Incomplete or Insufficient Air Operator and Air Agency Certification Applications
When it appliesBefore you are on the applicant listAfter certification has begun
In forceJanuary 26, 2026 to January 26, 2027May 26, 2026 to May 26, 2027
First issuedJanuary 2024, as Notice 8900.687May 2025, as Notice 8900.735
The 15 daysTo respond when your package is returnedTo answer a corrective action letter, or to tell the team you can’t meet a requirement
If you miss itWithdrawn from the FAA’s systemApplication treated as withdrawn and the project closed

Both notices are written for FAA staff, and both say they are guidance that is not legally binding in its own right. They still describe what your office and your certification team have been told to do. Each lasts a year, and each has been reissued when it expired.

The readiness checklist: 14 items

The FAA says too many applicants were reaching the front of the line unprepared, which lengthened the wait for everyone. Since January 2024 an office has to decide an applicant is ready before it adds them to the list. For a repair station, ready means these 14 items.

Applicant readiness checklist for Part 145 repair stations (Notice 8900.766, Table A-8)
No.ItemThe FAA’s reference
1FAA Form 8400-6, Preapplication Statement of Intent
2Description of housing, facilities and proposed personnel numbers, if availableForm 8400-6 box 10; 14 CFR 145.103. If unavailable, state your intentions on the schedule of events.
3Stated intent as a hazmat employer, as 49 CFR 171.8 defines oneForm 8400-6 box 10; 14 CFR 145.53(c)
4Repair Station Manual14 CFR 145.207
5Quality Control Manual14 CFR 145.211(c)
6Training program manual14 CFR 145.163
7Forms manual, if the forms aren’t in another manual14 CFR 145.211(c)(3)
8List, by type and make and model as appropriate, of each article applied for14 CFR 145.51(a)(3)
9List of contract maintenance functions14 CFR 145.217
10FAA Form 8310-3, Application for Repair Station Certificate and/or Rating
11Proposed schedule of eventsTimeline in calendar days, not actual dates
12Capability list, if applicable14 CFR 145.215
13Recommendation letters and FAA Form 8610-3 applications for any proposed repairman
14Process specifications for limited ratings, if applicable14 CFR 145.61(c)

The rule for the schedule of events is specific. Its timeline for acquiring facilities and equipment after certification begins has to be in calendar days, such as 30 days, not in actual dates.

For what goes in items 1 to 3, see Form 8400-6, line by line.

What the office does with your package

  • Everything is there. The office accepts the application, checks its own resources and adds you to the applicant list to wait for inspectors.
  • Something is missing. The office returns the package with a list of what was not met, and records whether this is your first return or your second. You have 15 days to respond or resubmit. After that it withdraws you.

The notice treats that acceptance as the end of phases 1 and 2. By its account the certification process then begins with phase 3, document compliance.

If you were already in line

Offices were told to send the checklist to applicants already on the list and to give them 30 days to submit the items and confirm they mean to stay. An applicant who doesn’t answer is withdrawn. One who applies again later goes through the readiness check from the start and loses the original place in line.

What we saw in practice

Our own PASI went in before the 2026 edition of the notice. When the FAA reached our file in May 2026, we still had a preapplication meeting and then 45 days to file the formal application. So practice can differ from the notice, by office and by when you joined the list. Prepare for the stricter reading and have the whole package drafted before you file.

The 15-day deadlines during certification

Notice 8900.775 covers what happens once the FAA has started work on your application. It applies to new applications submitted on or after its effective date, and it requires the FAA to explain the process to you in writing at the start.

What gets an application treated as withdrawn

  • Falling behind the schedule of events you agreed with the team, or missing a deadline for corrected documents
  • Asking to withdraw, or pulling back part of the application so that it is no longer complete
  • Not having the people the certification needs at the point it needs them, whether from a delay in hiring or from losing someone
  • Not having the equipment at the point it is needed
  • Not having the facility at the point it is needed
  • Not responding in the time the team gave you, responding late or inadequately, or sending documents that don’t meet the regulations

The two clocks

Answering a corrective action letter. When the team finds deficiencies it has to tell you in writing, in a letter that lists and explains them. You have 15 calendar days from the day you receive it. The response doesn’t have to be the finished, acceptable document. It does have to reach the team inside the 15 days, with either the corrections or a plan and dates for making them.

Reporting a problem yourself. If you can no longer meet or maintain something the certification requires, the notice expects you to tell the team within 15 calendar days.

Calendar days include weekends and holidays. The clock starts when you receive the letter, which is why the notice tells teams to use mail or email they can track.

Withdrawn or denied

Withdrawn. The project is closed without involving the FAA’s lawyers, and you may reapply when you are ready. The withdrawal letter asks you to come back with all the required preapplication information. Meanwhile the FAA moves on to the next applicant on its list.

Denied. When an applicant is unable or unwilling to resolve a regulatory requirement, the office refers the application to the FAA’s Office of the Chief Counsel for a formal denial under 14 CFR 13.20. The applicant can request a hearing. While a hearing request is pending, the FAA won’t process a new application from that applicant.

If a corrective action letter arrives

This is the plan we work to. Our own document package was returned twice, and each time the complete revised set went back to the FAA in 11 days.

  1. Day 0: record the date. Note when the letter arrived and how. Keep the email or the envelope. The 15 days run from receipt.
  2. Day 1: say you have it. Reply in writing to the person who sent it. Say the letter arrived and a full response is coming.
  3. Days 1 to 3: list every item. Give each one a line: what the FAA said, the regulation it cites, and the manual page it touches. Separate the regulatory items from the recommendations and start with the regulatory ones. Ask about anything unclear now, not on day 14.
  4. Days 3 to 10: fix the documents. Revise complete documents, not loose pages, with a new revision level, a date and change bars. Our team did not accept piecemeal submissions.
  5. By day 12: send the response. Answer every item. Where a fix needs longer than 15 days, say what will be done and by what date. A plan with dates counts as a response. Silence doesn’t.
  6. Afterward: keep the proof. Save what you sent, when you sent it, and the team’s confirmation that it arrived.

If you are still in the queue

  • Read the email address on your PASI every working day. A checklist request or a call-up can arrive at any time.
  • Keep the 14 items current. If your address, people or ratings change, update the package.
  • Hold on to your facility and your key people. Losing either at the wrong moment is a listed reason for withdrawal.
  • Decide now who answers the FAA when you are busy. You can authorize an agent for service to do it.

Sources

This guide summarizes FAA guidance and our own experience. It is not legal advice. The notices expire and are reissued, so check the FAA’s site for the current edition, and treat your own certification team’s written instructions as the ones that count.

Tell us about your shop

A few questions about your shop. We read every message ourselves and reply by email. If we look like a fit, you get a written scope and price before any work starts.

Prefer email? hello@stationreadiness.com

For example: limited airframe, class 1 accessory, limited instrument.

Do you have a facility today?

We use what you send only to reply to you. How we handle it.