FAA Form 8400-6 (PASI), line by line
The Preapplication Statement of Intent is two pages with eleven numbered boxes. A repair station applicant fills in eight of them. Here is what each one asks for, what to write, and what the FAA now expects to arrive with the form.
The short answer
Form 8400-6 tells the FAA who you are, where you will work, which ratings you want and who will run the station. Fill in Sections 1A, 1C and 1E. Leave 1B, 1D and Section 2 blank. Have someone who can commit the company sign it, then send it to your local Flight Standards District Office or submit it through the FAA’s SAS External Portal.
The form alone no longer puts you in line. Since 2024 the FAA checks a readiness package before it adds an applicant to its list.
Before you start
Use the current edition. The bottom of each page should read “FAA Form 8400-6 (05-17)”. The approval date printed at the top expired in April 2024, which makes people wonder whether a newer form exists. It doesn’t. The FAA’s forms page lists this edition as active.
Expect some boxes not to apply. One form serves airlines, charter operators, repair stations and maintenance schools. A repair station skips the boxes written for operators.
Read the fine print as a warning. The paperwork statement at the top estimates about 96 hours per response. Two pages don’t take 96 hours. Treat the figure as a sign of how much sits behind the form.
| Section | Boxes | Written for | Repair station applicant |
|---|---|---|---|
| 1A | 1 to 5 | All applicants | Fill in |
| 1B | 6 | Air operators | Leave blank |
| 1C | 7 | Air agencies | Fill in the Part 145 side |
| 1D | 8 and 9 | Air operators | Leave blank |
| 1E | 10 and 11 | All applicants | Fill in and sign |
| 2 | Not numbered | The FAA district office | Leave blank |
Section 1A: boxes 1 to 5
-
Box 1
Name and mailing address of company
Use the legal name exactly as it appears on your formation documents, down to the punctuation and the “LLC” or “Inc.” Before our preapplication meeting the FAA had us sign a business name acknowledgement and send those documents. In document review the name then had to match on every manual and form.
The mailing address may be a post office box. Box 2 may not.
-
Box 2
Address of principal base where operations will be conducted
The street address of the shop the FAA will inspect. The form says not to use a post office box, and the regulations ask for a description of your housing and facilities with the physical address.
If you don’t have the building yet, say so in box 10 and put the plan on your schedule of events. The FAA’s readiness checklist allows for that. Be aware that an application can be treated as withdrawn if the facility isn’t there when the certification reaches the point of needing it.
-
Box 3
Proposed start-up date
The date you expect to begin work under the certificate. Be realistic. The FAA doesn’t schedule around this box. The wait for a certification team is set by the applicant list, and ours was more than a year. A date that agrees with your schedule of events is more useful to the reader than a hopeful one.
-
Box 4
Requested three-letter company identifier, in order of preference
Three choices of three letters, the one you want most first. These are the letters you would like the FAA to use when it assigns your certificate designator. The FAA makes the assignment, and what you get may not be any of your three.
Ours came with the certificate number at the scoping session, within a week of the preapplication meeting. From that day the number had to appear on every manual. Don’t print anything with a number on it until the FAA has issued one.
-
Not numbered
Company email address, and doing business as (DBA)
Email. Give an address someone reads every working day. The FAA’s notices arrive by email with deadlines of a week or two, and an unanswered one can now end an application. We missed the first notice ourselves and caught the reminder.
DBA. Enter a trade name only if you have registered one. Otherwise leave it blank. Whatever goes here will be compared with your other documents.
-
Box 5
Management personnel
Name (last, first, middle), title, telephone and email for each person. List the accountable manager first. The regulations require you to designate one, and they define that person as responsible for everything the station does under part 145 and as the FAA’s primary contact.
Then list the people who will supervise and inspect the work, such as a chief inspector and a maintenance supervisor. In a small shop one person may hold more than one of these roles. Say so plainly. When the FAA picked up our file, we sent a resume for each person named.
Section 1C: box 7, type of agency and ratings
-
Box 7
Proposed type of agency and rating(s)
Check Part 145 Repair Station, then Domestic, Foreign or Satellite. The New and Renew boxes sit beside Foreign because a foreign repair station’s certificate has to be renewed. A domestic one stays in force until it is surrendered, suspended or revoked.
Then check the ratings you want: Airframe, Powerplant, Propeller, Radio, Instrument, Accessory or Specialized Service. The last box, “any other purpose,” quotes the catch-all at the end of the limited ratings rule.
The form has one box per rating. It doesn’t ask whether you want a class rating or a limited rating, which class, or which makes and models. All of that goes in box 10, for example “Limited airframe: [make and model]” or “Accessory, Class 1.”
Ask only for what you can show on inspection day. Every rating has to be backed by housing, tools, technical data and trained people, and each one adds pages to the manuals and questions to the review. We applied for two limited ratings and dropped one during document review so it would not hold up the other.
Section 1E: boxes 10 and 11
-
Box 10
Additional information
For a repair station this box does most of the work. The FAA’s Part 145 page says the applicant must address on this form how the requirements for personnel, facilities, equipment and documentation will be met, and its readiness checklist points to box 10 by number for two items. The space on the form is a few lines, so attach sheets. Cover:
- Ratings in detail. Class or limited, the class numbers, the makes and models.
- Housing and facilities. What the building is, how big, how it is laid out, and whether you own or lease it.
- People. How many you expect to employ and in what roles.
- Hazardous materials. Whether you will be a hazmat employer as the Department of Transportation defines it. Before a certificate is issued, a U.S. station has to confirm in writing that its hazmat employees are trained.
- Anything unusual. Work away from the station, maintenance functions you will contract out, air carrier customers.
- Who speaks for you. If you have authorized an agent for service, name them and attach the signed authorization.
-
Box 11
Signature, date, name and title
The form says the signature denotes an intent to apply for FAA certification. Sign as the accountable manager, or as an owner or officer who can commit the company. A consultant can prepare every word of this form but can’t sign it for you.
The parts you leave blank
- Section 1B, box 6. Type of operation, for air carriers and operators.
- Section 1D, boxes 8 and 9. Aircraft data and geographic area, also for operators.
- Section 2. Received by, precertification number, dates and remarks. These belong to the FAA district office.
What has to arrive with it
Under the FAA’s current readiness policy, Notice 8900.766, the office checks a repair station’s package against 14 items before it adds the applicant to its list. The form is the first. The rest include:
- The Repair Station Manual, Quality Control Manual and training program manual
- A forms manual, if your forms aren’t part of another manual
- The list of articles you are applying to work on, by type, make and model
- The list of maintenance functions you will contract out
- FAA Form 8310-3, the application itself
- A proposed schedule of events
- A capability list and process specifications, where they apply
- Recommendation letters and applications for anyone you want certificated as a repairman
See all 14 items with the FAA’s references.
Practice can differ from the notice. When the FAA reached our file in 2026, we still had a preapplication meeting and then 45 days to file the formal application. The notice in force now says an applicant accepted onto the list has already completed those two phases. Ask your office which one they will hold you to, and prepare for the stricter reading.
How to send it, and what happens next
Send the signed form and the package to your local Flight Standards District Office. The FAA also takes preapplication information through its SAS External Portal, where you enter the same details and upload a signed copy of the form. Whichever route you use, keep a copy of everything and a record of the date.
The office reviews the package against the readiness checklist. If something is missing it returns the package with a list, and you have 15 days to respond before you are withdrawn. If everything is there, the office accepts the application and adds you to the applicant list. Then you wait.
Keep the form current while you wait. If your address, your people or your ratings change, send an updated one. We revised ours and uploaded it again when the certification team picked up our file.
Six mistakes to avoid
- A company name that doesn’t match your formation documents letter for letter
- A post office box in box 2
- Rating boxes checked in box 7 with nothing in box 10 to explain them
- Ratings you can’t support with tools, data and people on inspection day
- An email address nobody reads
- Sending the form by itself and starting the manuals later
Sources
- FAA forms: Form FAA 8400-6, Pre-Application Statement of Intent
- FAA Form 8400-6, edition 05-17 (PDF)
- FAA: Become a Certificated 14 CFR Part 145 Repair Station
- FAA Notice 8900.766, Determine Applicant Readiness for Certification
- FAA quick reference card: Entering Preapplication Information in the SAS External Portal (PDF)
- 14 CFR part 145, Repair Stations (eCFR): sections 145.3, 145.51, 145.53, 145.55, 145.59, 145.61 and 145.151
This guide describes the form and our own experience with it. It is not legal advice, and your FAA office has the last word on what it will accept.
Keep reading
Tell us about your shop
A few questions about your shop. We read every message ourselves and reply by email. If we look like a fit, you get a written scope and price before any work starts.
Prefer email? hello@stationreadiness.com